May 7, 2010 May 6, 2010 May 5, 2010 The day begins by cutting the 5 sheets that will form the 10 linear feet of fake roll.
And cutting Plasma 2-disc, 22 cm in diameter. who will act as "ghosts" of the rivet (5 th stage of the installation of rivet)
Others charge well stall the frame to weld the front plate, tubes and rivet heads.
Then roll the sheet of fake how to be rolled.
And the edges of each sheet are correct hammer to fit the curve of true roll.
holes that allow the plug weld the "ghost" on the front panel are drilled,
and welding is performed.
is the turn of the tube forming the body of our rivet Step 5 to be welded.
Then the front plate on the frame.
Then the tube to the 5 th step to the front.
tube at the 4 th step.
In one of the 3 rd.
And finally, the monolith can be rectified!
Then it stalled, to frighten someone ....
the other side of the workshop, Mr. Julian, professor of boiler, assisted by his students, "link" (welding point by point) welds of sheets to be joined for the wrong roll.
We begin to think about the title of the sculpture. We leave on single track, a bit like looking for the name of an animal or a robot, being attentive to the particularities of our project. As in the day, the table fills with possible leads.