Wednesday, May 5, 2010

Blogger Template Pen Montblanc



After spending the first part of the day Clamecy, in preparation for my exhibition at the Museum of Art and History Romain Rolland I found the students at the beginning of the afternoon.
Things have progressed well.

The rivet heads of the 3rd and 4th stage were welded to the rear.


The hole cut in front of the plasma has been trimmed.
tubes (forming the body of the rivets), and second rivet head of the third stage have been cut.


I arrive when the tube of the third stage will be welded.


The frame is then positioned on the back, then "pointed" (spot-welded and not throughout).



And the rivet heads of the 3rd and 4th stage are welded on the front.




Finally, the 5 sheets of 2 mm thick. necessary for our fake roll are spread on the ground and traced so that tomorrow the cuts be made.

0 comments:

Post a Comment